Urgent Repairs Underway for Cracks in Jalan Tenaga HDB Blocks: Pritam Singh Addresses Residents' Concerns
2024-12-23
Author: Ming
Overview
The Aljunied-Hougang Town Council is taking decisive action to address worrying cracks that have appeared in the ceilings of several Housing Development Board (HDB) blocks along Jalan Tenaga in Bedok.
Initial Reports and Ongoing Work
In a recent Facebook update, Aljunied GRC Member of Parliament Pritam Singh revealed that residents first reported seven instances of ceiling cracks before essential re-roofing works began in September, followed by an additional five complaints during the renovation process. These troubling developments underline the urgent need for structural safety measures in the area.
Collaborative Efforts and Resident Engagement
"The town council is actively collaborating with our contractor, Solely, to resolve these issues promptly," Mr. Singh emphasized, urging residents to report any additional cracks or signs of water seepage. Such maintenance is crucial to ensure the safety and comfort of the people living in these HDB blocks.
Concerns Over Structural Integrity
According to The Straits Times, at least four residents expressed concerns over the structural integrity of their buildings, which were constructed between 1992 and 1993. With re-roofing work currently in progress on 17 blocks, the situation has become increasingly concerning, leading to widespread apprehension among affected residents.
Re-roofing Process Explained
The process of re-roofing typically includes removing the existing roof surface and installing a new waterproofing membrane, a vital step in extending the lifespan of the buildings. Importantly, additional roof improvements are planned soon for Blocks 601 to 629 and Blocks 101 to 121, marking a phase of extensive renovations aimed at enhancing the quality and durability of the structures.
Communication and Transparency
Mr. Singh reassured residents by announcing that the work schedule will be clearly communicated within all affected blocks, especially in light of concurrent installations of solar panels on various rooftops. This integration of green technology reflects Singapore's commitment to sustainability.
Resident Vigilance Encouraged
Residents have been urged to remain vigilant and report any emerging issues related to cracks or water seepage. "We are committed to addressing all concerns as swiftly as possible to guarantee a safe living environment," Mr. Singh added.
Scheduled Maintenance and Future Outlook
Previously, the town council indicated that these re-roofing efforts are necessary maintenance that occurs every 14 years. With completion expected by the second quarter of 2025—weather permitting—efforts are being made to ensure the repairs do not disrupt residents' daily lives.
Community Trust and Safety
As concerns continue to grow, the responsiveness of the town council plays a critical role in maintaining community trust and safety. Local residents are encouraged to stay informed and engaged with ongoing updates regarding repairs in the Jalan Tenaga area.
Conclusion
Stay tuned for further developments on this pressing issue!